Kitchen Renovations — Salt Spring Island & Gulf Islands
Full-scope kitchen renovations on Salt Spring Island and the Gulf Islands. Cabinetry, countertops, tile, layout reconfiguration, electrical and plumbing coordination — one written estimate, one accountable contact from demo to final installation.
What We Handle
Every kitchen project is scoped end-to-end — from demo through to final installation and cleanup.
Cabinetry & Layout
Custom and semi-custom cabinetry supply and install. Layout changes, island additions, pantry builds. Framing included in scope.
Countertops & Surfaces
Quartz, butcher block, laminate, tile. Template, fabrication coordination, and install. Backsplash tile included where scoped.
Electrical & Lighting
Under-cabinet lighting, pot light layout changes, dedicated circuit additions. Coordinated with licensed electrician.
Plumbing Rough-In
Sink relocation, dishwasher rough-in, garburator. Subcontracted licensed plumbing, scheduled as part of the project.
Flooring & Transitions
Kitchen flooring, transitions to adjacent rooms, toe-kick finishing. Matches existing or new flooring scope.
Demo & Disposal
Full strip-out of existing cabinetry, counters, flooring where required. Debris removed from site.
What's Included
Standard across every kitchen renovation GRR takes on — not extras you have to ask for.
Kitchen Renovations on the Islands
Kitchen renovations are the most commonly deferred project on island properties. Older Salt Spring homes often have kitchens from the 1970s and 80s — functional but outdated, with cabinetry past its lifespan and countertops that predate modern surface options. The supply chain reality is that cabinetry lead times on custom and semi-custom orders run 6–12 weeks minimum, meaning a kitchen renovation requires more advance planning than mainland projects where warehouse stock is available same-week.
GRR manages material procurement and sequencing — cabinetry orders, countertop templates after cabinet install, appliance delivery coordination — as part of the project plan. On island properties this matters more than most clients expect: countertop fabricators need to template after cabinets are set, not before, and ferry timing for oversized items like islands or large appliances needs to be planned in advance.
Most common scopes: full gut and replacement in older homes; layout reconfiguration to open the kitchen to adjacent dining or living space (involves framing, sometimes load-bearing assessment); countertop and backsplash replacement only (lower cost, high visual impact); cabinetry refacing or door replacement where the boxes are sound. On Gulf Islands properties, the limited pool of available trades means homeowners benefit from a contractor who manages the full project rather than coordinating multiple independent trades themselves.
Kitchen Renovation FAQ
Do you add a ferry charge to kitchen projects?
No. Ferry travel and logistics are factored into project planning and scheduling — not added as a separate line item.
How far in advance do I need to plan a kitchen renovation?
For a full kitchen renovation, plan for 3–4 months minimum from consultation to project start. Cabinetry lead times drive the schedule — custom and semi-custom orders typically run 6–12 weeks. We give you a realistic timeline at the estimate stage.
Can you do just countertops and backsplash?
Yes. Countertop replacement with backsplash tile is a common smaller scope we take on — typically 1–2 weeks on-site. We handle countertop templating coordination, fabrication, and installation with the backsplash tiled after the counter is set.
What if the renovation reveals wiring that doesn't meet code?
We document it, stop, and provide a written scope for the additional work before proceeding. Electrical discoveries are common in island homes from the 1970s and 80s — we treat them as separate documented scopes, not absorbed costs.
Do you handle appliance installation?
We coordinate appliance delivery timing and handle installation of built-in appliances (dishwasher, range hood, over-range microwave, fridge panels). Freestanding appliance installation is included where it's part of the project scope.
Renovating a kitchen on Salt Spring Island or the Gulf Islands?
Start with a written estimate. Tell us what you're working with.